City Walk Crystalline 3
Not yet under construction
Planned handover 10 Dec 2028
Project facts
- units
- 195
- buildings
- 2
- Master community
- City Walk
- DLD area
- Al Wasl
- Escrow bank
- Abu Dhabi Commercial Bank (ADCB)
- Zoning authority
- Dubai Development Authority (DDA)
- Start date
- 16 Apr 2025
- Planned completion
- 10 Dec 2028
- DLD project no.
- 3531
DLD description
Technical description as registered with the Dubai Land Department.
The project is a standard residential apartment located at Citywalk. It introduces a one level shared basement and ground with 2 retails directly accessed from the building facade adjoining the main lobby, Building A: B+G+11+R: comprising 112 units, and Building B: B+G+10+R: comprising 81 units each. In total, the residences include 193 apartments, which offer a mix of unit types: 1-bedroom, 2-bedroom, 3-bedroom, 4-bedroom, and 4-bedroom duplex apartments.
More from Citywalk Residential 1 nearby
- 115
- units
- 1
- buildings
6% complete- 148
- units
- 1
- buildings
51% complete- 214
- units
- 1
- buildings
68% complete- 192
- units
- 2
- buildings
5% complete- 218
- units
- 1
- buildings
62% completeHandover Dec 2025- 214
- units
- 1
- buildings
62% completeHandover Mar 2026