City Walk Crystalline 2
Not yet under construction
Planned handover 10 Dec 2028
Project facts
- units
- 203
- buildings
- 2
- Master community
- City Walk
- DLD area
- Al Wasl
- Escrow bank
- Abu Dhabi Commercial Bank (ADCB)
- Zoning authority
- Dubai Development Authority (DDA)
- Start date
- 16 Apr 2025
- Planned completion
- 10 Dec 2028
- DLD project no.
- 3530
DLD description
Technical description as registered with the Dubai Land Department.
The project is a standard residential apartment located at Citywalk. It introduces one level shared basement and ground with 2 retail units directly accessed from the building fa?ade adjoining the main lobby: Building A: B+G+12+R: comprising 116 units, and Building B: B+G+11+R: comprising 85 units each. In total, the residences include 201 apartments, which offer a mix of unit types: 1-bedroom, 2-bedroom, 3-bedroom, 4-bedroom, and 4-bedroom duplex apartments.
More from Citywalk Residential 1 nearby
- 115
- units
- 1
- buildings
6% complete- 148
- units
- 1
- buildings
51% complete- 214
- units
- 1
- buildings
68% complete- 192
- units
- 2
- buildings
5% complete- 218
- units
- 1
- buildings
62% completeHandover Dec 2025- 214
- units
- 1
- buildings
62% completeHandover Mar 2026
Facts on this page come from the Dubai Land Department open data registry and may lag the developer's own updates. Prices, floor plans and payment plans are not part of the registry: ask IZBA for current availability.