City Walk Crystalline 1
Not yet under construction
Planned handover 30 Sept 2029
Project facts
- units
- 202
- buildings
- 2
- Master community
- City Walk
- DLD area
- Al Wasl
- Escrow bank
- RAKBANK
- Zoning authority
- Dubai Development Authority (DDA)
- Start date
- 8 Sept 2025
- Planned completion
- 30 Sept 2029
- DLD project no.
- 3801
DLD description
Technical description as registered with the Dubai Land Department.
The project is a standard residential apartment development located at Citywalk. It introduces one level shared basement and ground with 4 retails directly accessed from the building facade adjoining the main lobby. Building A: B+G+12+R: comprising 99 units, and Building B: B+G+12+R: comprising 99 units each. In total, the residences include 198 apartments, which offer a mix of unit types: 1-bedroom, 2-bedroom, 3-bedroom, 4-bedroom duplex and penthouse apartments
More from Citywalk Residential 1 nearby
- 115
- units
- 1
- buildings
6% complete- 148
- units
- 1
- buildings
51% complete- 214
- units
- 1
- buildings
68% complete- 192
- units
- 2
- buildings
5% complete- 218
- units
- 1
- buildings
62% completeHandover Dec 2025- 214
- units
- 1
- buildings
62% completeHandover Mar 2026
Facts on this page come from the Dubai Land Department open data registry and may lag the developer's own updates. Prices, floor plans and payment plans are not part of the registry: ask IZBA for current availability.